Paid for by the public: as electricity billpayers, and as taxpayers standing behind the loans.
DividendsA payment a company makes to its shareholders out of its profits. more ›, interest and fees that the Moray Firth wind farms and SSEN Transmission pay (or owe) to owners and lenders based outside the UK, drawn from each company's own Companies HouseThe UK government registry where companies file their accounts and ownership details, most of which the public can read for free. more › accounts and SSE plc's annual report.
Dividends to owners outside the UK, by stake£139.9mcomputed, from filed figures
To owners outside the UK (including Guernsey vehicles), latest dividendA payment a company makes to its shareholders out of its profits. more › declared and paid by each farm. Each farm pays its dividend to a UK holding companyA company that exists mainly to own shares in another company, often sitting between a wind farm and its ultimate owners. more ›; the split to the ultimate owners is computedLabels on the evidence register showing how strong a figure's source is: an official document, a press report, arithmetic, or an estimate. more › from their stakes, not reported.
How this is worked out
Beatrice, year to 31 Mar 2025: £21.025m to Red Rock Power (China), 25% of £84.1m. Moray East, year to 31 Dec 2025: all of its £104.2m dividend, since its three owners — Ocean Winds (Portugal/France, £41.68m), Diamond Green (Japan, £34.803m) and Equitix Anemoi (Guernsey, £27.717m) — are all outside the UK. TRIG, which receives Beatrice's £14.7175m, is incorporated in Guernsey, outside the UK (as reportedA number taken directly from a company's own accounts or a regulator's own published document, not calculated or estimated by this site. more ›). £21.025m + £14.7175m + £104.2m = £139.94m. Beatrice's Equitix share (£14.7175m) is excluded: where that vehicle is registered has not been traced — see the dividends section below.
Bank interest expense, latest filed year£132.830mfiled figures, two farms
Beatrice and Moray East's bank-debt interest, latest filed year. These are the interest charges recorded in the accounts, not cash paid. Moray West's is excluded here because its filing does not separate bank-debt interest from shareholder-loan interestMoney a company's own owners lend to it, on which the company pays interest back to them, separate from bank debt. more › and guarantee feesA charge paid for a third party's promise to cover a loan if the borrower cannot repay it. more › — see the bank interest section. Beatrice's cash-flow statement shows interest actually paid of £100.9m, partly offset by £47.5m of swap receipts (year to 31 Mar 2025); Moray East's cash figure is not legible in the filing.
How this is worked out
Beatrice £52.4m (FY2025, to 31 Mar 2025), paid to a syndicate of 13 commercial banks plus the European Investment Bank, all individually named, about 86% foreign by count (Japan, France, Germany, Spain, Australia and others); the filing does not split the £52.4m by individual lender. Moray East £80.430m (FY2025, to 31 Dec 2025), paid to a syndicate that includes one named direct lender, Japan's JBICJapan's state development bank, which lent directly to Moray East's construction financing. more › (which lent about £743m of the original debt package), plus a syndicate of commercial banks, not individually named or counted in any source found, and a Danish export-credit guarantee; the filing does not split the £80.430m between JBIC and the unnamed banks. £52.4m + £80.430m = £132.830m. No reliable pound-for-pound split between named and unnamed lenders exists in either filing — only the composition described above.
Interest and fees accrued, not yet paid£44.147mfiled figures, accrued/capitalised
Owed to foreign shareholders on intercompany loans, added to construction cost rather than paid in cash.
How this is worked out
Caledonia £7.962m (2025) shareholder-loan interest, owed to its parent, funded back-to-back by OW FS Offshore S.A., a subsidiary of OW Offshore S.L., Madrid (a Spanish joint ventureA company owned jointly by two or more other companies, set up to run a particular business or project together. more › of EDP Renováveis of Portugal and Engie of France). Moray West £4.354m (2024) shareholder-loan interest plus £31.831m (2024) guarantee fee and interest on the guarantee fee, the £31.831m guarantee fee is owed to OW FS Offshore S.A. (Ocean Winds, Portugal/France) and UAB Ignitis Renewables (Lithuania, as reported); the £4.354m shareholder-loan interest is owed to the parent company, whose own funding source is not stated. £7.962m + £4.354m + £31.831m = £44.147m. All three are described in the accounts as capitalised intoInterest added to the recorded cost of a project under construction, rather than paid out in cash straight away. more › the cost of the asset under construction, not cash paid out in the year.
Dividends
Beatrice Offshore Windfarm — dividend £84.1m, year to 31 Mar 2025
Beatrice
£21.025mcomputed, 25% split to Red Rock Power / Red Rock Renewables, ultimately China's State-Owned Assets Supervision and Administration Commission. £14.7175m each computed to The Renewables Infrastructure Group (TRIG), which is incorporated in Guernsey, and to Equitix, whose vehicle's place of registration has not been traced. Neither fund's own underlying investors have been traced. A further £16.0m interim dividendA dividend paid or declared during the financial year, or shortly after it, rather than waiting for the full year-end accounts. more ›declared, not yet in FY2025 accounts was approved after the year end, to the same ownership split.
Moray Offshore Windfarm (East) — dividend £104.2m, year to 31 Dec 2025
Moray East
All three owners of Moray East are outside the UK: £41.68mcomputed, 40% split to Ocean Winds (Portugal/France), £34.803mcomputed, 33.4% split to Diamond Green (Kansai Electric and Inpex, Japan), and £27.718mcomputed, 26.6% split to Equitix Anemoi, a Guernsey vehicle (manager based in the UK); its register also lists a UK-incorporated holder, Equitix MA 21 Capital Eurobond Ltd, at 25–50%, so part of this share may stay in the UK. A further £56.790m interim dividend declared, not yet in FY2025 accounts was declared after the year end, to the same split.
Bank interest
Interest expense on other financing liabilities
Beatrice
£52.4mfiled figure (FY2025, to 31 Mar 2025); £57.7mfiled figure the year before. The lenders named are the 2016 construction syndicate (which also included a £70m ticket from Copenhagen Infrastructure Partners); the debt was refinanced in July 2019 and the current lenders are not named in any source found. Paid to a 2016 project-financeBorrowing raised against the future income of a specific project, repaid from that project's own cash flow rather than the parent company's wider finances. more › syndicate, refinanced in 2019 under MUFG Bank as security trusteeA bank that holds the legal security for a group of lenders, without itself being an owner or necessarily a lender. more ›: 13 commercial banks plus the European Investment Bank — BNP Paribas, Commonwealth Bank of Australia, EIBThe European Investment Bank, a lender to some of the Moray Firth wind farm financing syndicates. more ›, ING, CaixaBank, KfW, Lloyds, MUFG, Natixis, RBS, Santander, Siemens Bank, Société Générale and Sumitomo Mitsui — with Denmark's export-credit agencyA foreign government body that guarantees loans to help its own country's exporters win contracts abroad. more › EKF guaranteeing part of the EIB loan. 12 of 14, about 86% of the 2016 syndicate, are foreign institutions by count computed.
Interest on borrowings and others
Moray East
£80.430mfiled figure (FY2025, to 31 Dec 2025); £103.298mfiled figure the year before. The Japanese state bank JBICJapan's state development bank, which lent directly to Moray East's construction financing. more › lent about £743m directly as reported, JBIC press release, alongside a syndicate of commercial banks, not individually named or counted in any source found, and a Danish EKF guarantee on part of the package.
Gross borrowing costs — bank debt, shareholder loan and guarantee fee combined
Moray West
£164.825mfiled figure (FY2024, to 31 Dec 2024), of which £134.764m was capitalised intoInterest added to the recorded cost of a project under construction, rather than paid out in cash straight away. more › the asset under construction and £30.061m was expensed through the profit and loss account. The filing does not separate the bank-only share of either figure from the shareholder-loanMoney a company's own owners lend to it, on which the company pays interest back to them, separate from bank debt. more › and guarantee-fee elements, so neither is included in the headline bank-interest total above. Lenders: an 18-bank club as reported before financial close (IJGlobal, January 2023) — AIB, Bank of China, Bank of China Luxembourg, BBVA, BNP Paribas, BNP Paribas Fortis, CIBC, CIC, Commerzbank, Crédit Agricole, KBC, Lloyds, MUFG Bank, NatWest, Siemens Bank, Société Générale, Standard Chartered and Sumitomo Mitsui Trust Bank — of which 15 of 18, about 83%, are foreign by count computed, plus the Ocean Winds/Ignitis shareholder loan covered below.
Shareholder-loan interest and fees
Interest on shareholder loans, capitalised
Caledonia
£7.962mfiled figure, accrued not paid (2025); £7.099m the year before (2024). Caledonia's own note states these are "back-to-back arrangements", with the ultimate funding provided by OW FS Offshore S.A., a fellow subsidiary of OW Offshore S.L., Madrid — a 50/50 joint ventureA company owned jointly by two or more other companies, set up to run a particular business or project together. more › of EDP Renováveis (Portugal) and Engie (France). Almost all of it is offset the same year by capitalisedInterest added to the recorded cost of a project under construction, rather than paid out in cash straight away. more › borrowing costs; none of it was a cash payment out of the UK in the year. Loan balance at 31 Dec 2025: £113.617m.
Shareholder-loan interest and guarantee fee, capitalised in borrowings
Moray West
£4.354mfiled figure, accrued not paid shareholder-loan interestMoney a company's own owners lend to it, on which the company pays interest back to them, separate from bank debt. more › and £31.831mfiled figure, accrued not paid guarantee feeA charge paid for a third party's promise to cover a loan if the borrower cannot repay it. more › and interest on the guarantee fee (both 2024), owed to OW FS Offshore S.A. (Ocean Winds, Portugal/France) and UAB Ignitis Renewables / AB Ignitis grupė (Lithuania). Both are capitalised into the cost of the asset under construction, not paid out in cash in the year.
No shareholder-loan interest payable
Beatrice
Beatrice has no shareholder loan to pay interest on. The only inter-group loan runs the other way: Beatrice Offshore Windfarm HoldcoA company that exists mainly to own shares in another company, often sitting between a wind farm and its ultimate owners. more › owes Beatrice Offshore Windfarm Ltd, and the operating company earns interest receivable of £2.8m (2025) / £2.9m (2024) filed figure on that loan — money coming in, not leaving. Holdco is incorporated in Perth, Scotland.
Shareholder loan settled in full
Moray East
Moray East's shareholder loan was repaid in full in FY2024 from the proceeds of selling its transmission asset to TC Moray East OFTOAn Offshore Transmission Owner: a separate, often investor-owned company that owns the cable linking an offshore wind farm to the grid. more › Ltd. The filing records a £Nilfiled figure accrual of shareholder-loan interest in the current year; all of Moray East's interest costs are now bank-debt related.
SSEN Transmission and Ontario Teachers'
Profit attributable to the 25% non-controlling interest
Nothing has left yet on this line
SSE plc's accounts attribute £188.3madjusted measure, as reported of SHET's profit to Ontario Teachers' Pension Plan Board's 25% stake for the year to 31 March 2026, and £107.3m the year before. Cash dividendA payment a company makes to its shareholders out of its profits. more › or distribution actually paid to Ontario Teachers' in either year: £0filed figure, nil both years. SHET's own accounts state plainly that "the Board did not declare or pay a dividend" in either year, and the SSE plc Group's Consolidated Statement of Changes in Equity shows no dividend or distribution line against the non-controlling-interestsA stake in a company held by someone other than its main parent company, such as Ontario Teachers' 25% of SSEN Transmission. more › column in either year. The £188.3m and £107.3m are retained, undistributed profit — not cash that has crossed to Canada.
Interest payable to SSE plc, SHET's own parent
Separately, within the UK
SHET recorded £25.8m (FY2025/26) and £25.2m (FY2024/25) of interest payable to SSE Group companies, on internal loan stock and a facility advance. This is not a foreign outflow: Ontario Teachers' holds equity in SHET, not debt, and no shareholder-loanMoney a company's own owners lend to it, on which the company pays interest back to them, separate from bank debt. more › arrangement with Ontario Teachers' was found in the filing.
Money coming in, not leaving
Ontario Teachers' Pension Plan Board (Canada) paid SSE plc £1,465.0mas reported, SSE plc Annual Report 2023 gross (£1,448.1m net of £16.9m transaction costs) in November 2022 for its 25% stake in SHET. This is capital SSE received, not money it has spent or paid out since.
SHET also agreed £2.0bnas reported, FACT-SHEET.md fact 14E of new guaranteed bank facilities, half backed by the UK National Wealth FundA UK government-owned investment body that can guarantee loans to infrastructure projects, backed by taxpayers. more › and half by foreign export credit agencies, in the year to 31 March 2026: a £1.0bn facility with an £800m guarantee from the UK National Wealth Fund, a £0.5bn facility guaranteed by Sweden's EKNA foreign government body that guarantees loans to help its own country's exporters win contracts abroad. more ›, and a £0.5bn facility guaranteed by Italy's SACE. These are capital made available, not spent: none of the three had been drawn at 31 March 2026. If SHET defaulted, the guaranteeing governments — and, for the National Wealth Fund facility, UK taxpayers — would stand behind the lenders.
Contractors and suppliers abroad
Vessels working for the Moray Firth farms and SSEN Transmission, and the main supply contracts found with a published value, with where each fact is established: the operatorThe company that owns or charters out a ship, as distinct from the client paying to use it for a particular job. more ›'s/supplier's own page, a press release, an official notice, or not established at all.
Vessel
Operator
Country
Class
VIKING REACH
Reach SubseaThe underwater section of the cable route, running from Shetland to the Aberdeenshire landfall. more › (vessel owned via the Eidesvik Reach AS joint ventureA company owned jointly by two or more other companies, set up to run a particular business or project together. more ›)
Norway
press
C-TROJAN
Reach Subsea UK Ltd
United Kingdom (operating subsidiary) / Norway (parent, Reach Subsea ASA)
notice
SKANDI ACERGY
DOF Group ASA
Norway
own page
SEVEN KESTREL
Subsea 7 S.A.
Luxembourg (registered company) / London (headquartered)
press
WIND PEAK
Cadeler A/S
Denmark
press
SEACAT SOVEREIGN
Seacat Services Ltd
United Kingdom
own page
NJORD ZEST
Njord Offshore Ltd
United Kingdom (shareholder PSA Marine, Singapore)
own page
ESVAGT WIND 8
ESVAGT, daughter craft of the SOV ESVAGT ALBA
Denmark
fleet manager's assessment
Project
Package
Supplier
Country
Value as published
Class
Moray East
Turbine supply (100 × V164-9.5MW)
MHI Vestas Offshore Wind
Denmark / Japan
not published
press
Moray East
Inter-array cables (102 × 66kV, supply + install)
Royal Boskalis Westminster N.V.
Netherlands
≈EUR 110m
press
Moray West
Turbines (60 × SG 14-222 DD)
Siemens Gamesa Renewable Energy
Spain
not published
press
Moray West
Export cable system (220kV, turnkey)
Nexans S.A.
France
not published
press
Moray West
Transition pieces (60 × WTG + 2 × OSS)
Lamprell
United Arab Emirates
>USD 200m
press
Beatrice
Export cable
Nexans S.A.
France
not published
press
Shetland HVDCHigh Voltage Direct Current: the technology used for long subsea electricity cables, including the Shetland link. more › Link 2
Cable supply + installation (frameworkA general agreement with a supplier for future work, without necessarily fixing the price of what is eventually ordered under it. more ›)
Sumitomo Electric Industries + Van Oord
Japan / Netherlands
not extracted (page text not retrievable)
own page
Vessel day ratesThe charge for hiring a vessel, including its crew, for one day; rarely published for offshore wind contracts. more › and most contract values are not published; the public pays for them through the mechanisms on the How the money works page.
Still not established
Moray East foundation fabricator.
Shetland 2 converter supplier.
Sources
Companies HouseThe UK government registry where companies file their accounts and ownership details, most of which the public can read for free. more › accounts: Caledonia Offshore Wind Farm Ltd (company 13844888), year ended 31 December 2025; Moray Offshore Windfarm (West) Ltd (10515140), year ended 31 December 2024; Beatrice Offshore Windfarm Ltd (SC350248), year ended 31 March 2025; Moray Offshore Windfarm (East) Ltd (07101438), year ended 31 December 2025; Scottish Hydro Electric Transmission plc (SC213461), year ended 31 March 2026. SSE plc Annual Report 2023 (Ontario Teachers' purchase, note 12.2) and Annual Report 2026 (segmental results, Consolidated Statement of Changes in Equity). Japan Bank for International Cooperation, press release, 29 November 2018 (Moray East financing). Reach SubseaThe underwater section of the cable route, running from Shetland to the Aberdeenshire landfall. more ›, press release on its SSEN Transmission survey contract (VIKING REACH). Kingfisher BulletinA fisheries-liaison service that publishes notices warning fishing vessels about offshore works, including which vessels are involved. more › fisheries-liaison notices (vessel identification). FACT-SHEET.md facts 14 and 14E (Ontario Teachers' purchase price and the guaranteed loan facilities, reused without re-deriving). For the contractors and suppliers section: DOF's own fleet page (dof.com, SKANDI ACERGY); Seacat Services' own fleet page (seacatservices.co.uk, SEACAT SOVEREIGN); Njord Offshore's own about-us page (njordoffshore.com, NJORD ZEST); Boskalis press release (boskalis.com, Moray East inter-array cables); Vestas press release (vestas.com, Moray East turbines); Nexans press releases (nexans.co.uk, Moray West and Beatrice export cables); Lamprell press release (lamprell.com, Moray West transition pieces); SSEN Transmission's own news pages (ssen-transmission.co.uk, Sumitomo Electric/Van Oord preferred-bidderThe contractor chosen to win a contract, ahead of final signature, often announced before the full contract value is disclosed. more › and frameworkA general agreement with a supplier for future work, without necessarily fixing the price of what is eventually ordered under it. more › announcements for Shetland HVDCHigh Voltage Direct Current: the technology used for long subsea electricity cables, including the Shetland link. more › Link 2); gCaptain (gcaptain.com, WIND PEAK); Wärtsilä's own ship-design reference case (wartsila.com, SEVEN KESTREL), alongside Wikipedia for Subsea 7's Luxembourg/UK domicile; offshorewind.biz (Moray West turbine award); and ESVAGT's own fleet list (esvagt.com), checked and found not to include a vessel named Wind 8. Full citations with file and line are in research/VESSELS-AND-SUPPLIERS.md.