The narration of film 2, scene by scene, as voiced, with the sources shown on screen in each scene. 5:01 · Watch or download on the Internet Archive · All eight films · Related page: The cable on this coast
The words are the author's; in the film an AI voice reads them. Register IDs link to the row of the evidence register that holds the document and line behind each figure. "Our arithmetic" marks a figure this site computedLabels on the evidence register showing how strong a figure's source is: an official document, a press report, arithmetic, or an estimate. more › from published numbers; "forecast" marks an official projection, not an outturn.
A cable is planned from Shetland to the Banffshire coast. It comes ashore at one of two shortlisted bays, Boyne Bay or Boyndie Bay. SSEN has not chosen yet, and this film takes no side. From the shore, about thirty kilometres of buried cable runs inland to a new converter hub north-east of Huntly. Energised by twenty thirty-five, says SSEN's timeline, which it calls indicative.
On screen: SSEN Transmission, Aberdeenshire coast landfallThe point on the coast where a subsea cable comes ashore and connects to the onshore cable route. more › options booklet, Autumn 2026 · S11, S12, S14, S15 / SSEN Transmission, project page, Aug 2026 update · S13
OfgemThe UK government regulator for gas and electricity, which sets how much network companies can charge billpayers. more ›'s consultation called it a new one point eight gigawatt link. And the price? No capital cost has been published. Not by SSEN, Ofgem or NESOThe National Energy System Operator, the body that keeps Great Britain's electricity grid balanced minute by minute. more ›. The only sum on record is pre-construction funding: sixty-eight point four million pounds, at twenty eighteen prices, and that is one total across four projects.
On screen: Ofgem, tCSNP2Ofgem's transitional Centralised Strategic Network Plan 2 process, under which this project was assessed and put in the delivery track. more › consultation, 1 Aug 2024 · S6, S8 / Ofgem, tCSNP2 decision (OFG1164), 11 Dec 2024, Q27 / Fact sheet, S17
The builder is SSEN Transmission. SSE plc owns seventy-five per cent. Ontario Teachers' Pension Plan, from Canada, owns twenty-five. It paid one thousand four hundred and sixty-five million pounds for that quarter in November twenty twenty-two. SSE's accounts valued that quarter of the company's net assetsA company's total assets minus its total liabilities: what would be left for shareholders if everything were sold and all debts paid. more › at five hundred and seventy-nine point eight million. Our arithmetic: two and a half times book.
On screen: SSE plc, Annual Report 2026 · S18, W29 / SSE plc, Annual Report 2023, note 12.2 · S19, L72, G59 / Our arithmetic · G59
Who pays for the build? Electricity billpayersAnyone who pays an electricity bill. Most of the costs on this site are recovered this way, not from taxes. more ›, through network charges. Ofgem sets the company's return: a cost of equityThe profit margin Ofgem lets a regulated grid company earn on shareholders' money, built into billpayers' charges. more › of five point seven per cent a year, above inflation. Ofgem forecasts its regulated asset value rising from about nine billion pounds to over thirty-five billion by twenty thirty-one. And behind the loans, an eight hundred million pound guarantee from the UK's National Wealth FundA UK government-owned investment body that can guarantee loans to infrastructure projects, backed by taxpayers. more ›, undrawnA risk that only turns into an actual cost if something specific happens, such as a loan guarantee only being called on if the borrower defaults. more › at the end of March.
On screen: Ofgem, RIIO-3Ofgem's current five-year price control, which sets how much transmission companies can charge billpayers and what return they earn. more › Final Determinations, Finance Annex, 4 Dec 2025 · S21 (Table 16), G17 (Table 53) / SSE plc, Annual Report 2026 · K57, L75 / Evidence registerA table listing every figure used on these pages, with its source document, its class and whether it has been checked. more › · R74; our arithmetic: G17 · Register rows: S20
So what does this coast get? Government guidance on community fundsMoney a developer or network owner pays to communities near new infrastructure, recovered in full from billpayers. more › pays per kilometre of overhead line, and per converter stationA large facility that converts electricity between the direct current used by a subsea cable and the alternating current used by the onshore grid. more ›. Underground cables, it says, are not within scope. So for the landfall and thirty kilometres of buried cable, the guidance rate is zero. The converter station at the inland hub would carry five hundred and thirty thousand pounds. And whatever is paid, Ofgem lets the company recover all of it from billpayers.
On screen: DESNZThe UK government department responsible for energy policy, including subsidy auctions and community fund guidance. more ›, Community Funds for Transmission Infrastructure guidance, 10 Mar 2025 · S61, S62 / Ofgem, Community Funds pass-throughA cost Ofgem lets a network company recover in full from billpayers, rather than paying for out of its own profit. more › guidance, 1 Apr 2026 · S65
A bill discount? The statute requires works wholly or partly above the ground. The buried cable cannot qualify, and this project is not on the government's list of those expected to be eligible. Now Peterhead, same council area. For one converter station site, SSEN set a local fund of two million, one hundred and fifty-nine thousand pounds. Our arithmetic: four times the guidance rate. The guidance is not a ceiling.
On screen: Electricity Act 1989The UK statute that underpins transmission licensing, the bill discount scheme and compulsory acquisition powers for projects like this one. more › s.38A(3) · S63 / DESNZ, expected eligible projects, 12 Aug 2026 · S64 / SSEN Transmission, EGL2 Peterhead Local Fund page · S66; DESNZ guidance; Our arithmetic, S67
Now the official case. Ofgem said the link will be required to dispatch the power from three prospective offshore wind farms, and would add resilience to the islands' supply. A serious case. So it gets the same test.
On screen: Ofgem, tCSNP2 consultation, 1 Aug 2024 · N141 (para 5.19)
In December twenty twenty-four, Ofgem put the project in its delivery track, with immediate pre-construction funding. By Ofgem's own definition, that track is for projects at NESO maturity level three or above. The system operator, responding to the consultation, wanted development track, due to immaturity. Ofgem's reason: the project was not being reassessed in NESO's offshore impact assessment. NESO's March twenty twenty-four workbook had it at level two. Level three arrives in June twenty twenty-six, with a note: delivery track status.
On screen: Ofgem, tCSNP2 decision (OFG1164), 11 Dec 2024, Q26 / NESO, Beyond 2030 workbook, Mar 2024 · Q31, Q32 (row 35) / NESO, Beyond 2030 update workbook, Jun 2026 · Q32 (row 89)
Still not published: a capital cost. The subsea cableThe underwater section of the cable route, running from Shetland to the Aberdeenshire landfall. more › length. The cable count. Any contract value. A working widthThe width of land needed during construction for the cable trench, access and storage; not published for this project. more › or easementA right to use a strip of someone else's land for the cable, without owning it outright. more › for the buried cable: not mentioned in any of SSEN's booklets for this project. The consenting route for the cable and the landfall. And any community benefit figure for this project. SSEN's feedback window closes on the sixth of November.
On screen: Fact sheet; register S17, S70, S71, S73, S74 / SSEN Transmission, Autumn 2026 booklet · S16
A cable lands here. The build goes on the bills, at a regulated return. The landfall's line in the guidance reads zero, and the price is still unpublished. Paid for by the public: as electricity billpayers, and as taxpayers standing behind the loans.
On screen: Ofgem, RIIO-3 FD Finance Annex · S21 / DESNZ guidance · S62 / SSE plc, Annual Report 2026 · K57;, S17 · Register rows: S2
The film ends with a card carrying this site's address, its disclaimer and the address for corrections. If a figure is wrong, the correction route is on the About page.